SELECTING A CUT-OFF GRADE FOR OPTIMIZING COMMERCIAL RESERVES OF ORE DEPOSITS
Keywords:
cut-off grade, industrial reserves, gold deposit, Chaarat, TulkubashAbstract
This article examines the rational use of mineral resources through reserve optimization using the Tulkubash gold ore site of the Chaarat deposit as an example. The author conducted a comparative analysis of three cutoff grade options (0.5 g/t, 1.0 g/t, and 1.5 g/t) using block modeling in Gemcom. Based on calculations, it was determined that the cutoff grade of 1.0 g/t is the most efficient for industrial mining, providing an optimal balance between ore volume and average gold grade.
References
1. Секисов Г.В. Зыков Н.В. Освоение минеральных объектов и методология оценки. М.: Изд-во «Горная книга», 2012 г.
2. Толобекова Б. Оптимизация запасов путем дифференциации бортового содержания.// Наука и новые технологии N2, Бишкек, 2006 г.
Downloads
Published
2026-06-01
Issue
Section
Статьи